Preparation of the hardware construction with E-Plan 5.7 or P8.
Strong knowledge in Process of assembly line for Powertrain and test equipment, hardware and software are included completely.
Familiarity with the necessary local regulations and standards. Control them during the project life cycle.
Define the control architecture for Assembly Systems project and test equipment project.
Compose and control of the safety concepts.
Prepare the control specification and RFQ for project.
Take the responsibility for costs, time and scope for control portion of the assigned projects.
Support proposals



-
采掘·冶炼
-
200-499人
-
外商独资·外企办事处
-
浦东新区高翔路526号